Installation reference
A20 install
Wiring context
Source packet
Norweco A20 air pump Use the installation reference, pressure-switch notes, and NPDES treatment-train context to confirm this is the correct post-aeration component before ordering.
Norweco septic part

Norweco A20 Air Pump

Replacement-order support for the Norweco A20 air pump used as a post-aeration, or reaeration, component in certain approved Ohio NPDES treatment trains. BE Ohio helps confirm the installed pump, pressure switch, power setup, tubing, and service history before fulfillment.

BrandNorweco SKUNORWECO-A20-AIR-PUMP ConditionNew replacement part
  • Order support for a verified Norweco A20 post-aeration air pump, not the main Singulair shaft aerator.
  • Fitment should be checked against the approved NPDES treatment train, Service Pro TNT monitoring, tubing, and pressure-switch setup.
  • Shipping, local pickup, job-site delivery, and installation support are confirmed before the order is released.
Current item price $192.40
Available to order
Buy With Square

$192.40 is the current item price before applicable tax, shipping, local delivery, pickup handling, or installation labor. The Merchant shipping table currently treats this A20 as a 10 lb shipped item in the high-end septic-parts class, and BE Ohio confirms the final fulfillment path before release.

Do not order an A20 as a generic aerator replacement. The A20 supports post-aeration in specific NPDES treatment trains and must be verified before release.

Online Offer Details

AvailabilityAvailable to order after BE Ohio confirms fitment, fulfillment path, and current stock timing.
ConditionNew replacement septic treatment component for verified Norweco A20 applications.
SKUNORWECO-A20-AIR-PUMP
BrandNorweco
Price$192.40 before applicable tax, shipping, local delivery, pickup handling, or installation labor.
Ordering pathUse the Square checkout link for the item and contact BE Ohio through chat or the portal if fitment, shipping, pickup, delivery, or install support needs confirmed first.

A20 Verification Before Ordering

System roleThe A20 is a post-aeration air pump used after treatment and disinfection where the approved NPDES train requires reaeration.
Not the 206C aeratorThe A20 is separate from the main Singulair mechanical aerator. Do not use this page to replace a 206C aerator.
Power contextPublic Norweco instruction text identifies a 120 volt GFCI-protected power circuit for the Model A20 air pump.
Monitoring contextThe A20 pressure switch is tied into Service Pro TNT Auxiliary Input 2 in the public instruction text.
Mounting contextThe pump should be horizontal, dry, shaded from direct sun, protected from excessive heat, and installed with ventilation.
Fitment checkSend photos of the pump, enclosure, pressure switch, tubing, Service Pro panel, UV unit, and permit paperwork before ordering.

Shipping, Pickup, Delivery, And Returns

ShippingMerchant listings use the conservative high-end septic-parts shipping class for this 10 lb A20 item. BE Ohio still confirms the packaged size, destination, pickup, delivery, or shipped-order rate before release. See the shipping and returns policy.
Local pickupLocal pickup can be arranged after payment, fitment confirmation, and pickup timing are confirmed.
Job-site deliveryDelivery to an Ohio job site can be arranged when the site address, access, and timing are confirmed.
ReturnsReturn review is limited by the public policy, including new, unused, uninstalled products and approved defective or shipping-damaged claims.
TaxApplicable tax is added through the checkout or invoice path used for the order.
Install laborInstallation, troubleshooting, wiring review, and NPDES service work are separate from the item price.

What Happens After You Start The Order

1. Photos are reviewedBE Ohio checks the installed pump, pressure switch, tubing, control panel, and treatment-train context.
2. Fitment is confirmedThe A20 is matched to the approved NPDES setup instead of being treated as a generic air pump.
3. Fulfillment is setCheckout, tax, shipping, pickup, delivery, or installation support is confirmed before release.
Need the A20 checked? Send photos of the pump, pressure switch, Service Pro panel, tubing, enclosure, UV unit, sample report, and permit paperwork before ordering.